п/п

Name of the project

Goal

Customer

Pavlodar

1.

Construction of the pumping station PNS-2/3 for heat supply of the microdistrict "Saryarka" in Pavlodar

1. Provision of heat supply to the neighborhood "Sary-Arka".

2. Providing readiness for additional heat loads from the consumers of the 2nd Pavlodar district and consumers within the boundaries of Ak. Chokin-K. Marx-Estay -1 May

GU "Construction Department

Pavlodar »

2.

Construction of intra-quarter heat supply networks for the residential complex "Saryarka"

Connection of heat consumers in the microdistrict "Saryarka"

GU "Construction Department

Pavlodar »

3.

Reconstruction of the heating main TM-37 from CHPP-3 with increasing diameter

Improving the heat supply regime for consumers fed from CHPP-3

Pavlodar Heating Networks LLP

4.

Construction of quarterly networks in the settlements "Radiozavod" and "Lesozavod"

Provision of the possibility of connection of all heat consumers in the villages Radiozavod, Lesozavod, summer cottages "Sosnovy Bor", "Irtysh"

GU "Construction Department

Pavlodar »

5.

Construction of heating main TM-43

(from CHPP-1 to microdistrict Dostyk-1)

1. Provision of heat supply for newly constructed buildings in the mall "Dostyk-1,2".

2. Creation of a reserve for the construction of district heating networks in IZhS, Airport, p. Kenzhekol,

GU "Construction Department

Pavlodar »

6.

Reconstruction of substation PS110 / 10 "East-city" in Pavlodar

Ensuring the reliability of electricity supply to consumers in the area of the 2nd Pavlodar, as well as the creation of a reserve

АО «ПРЭК»

7.

Reconstruction of the equipment of relay protection and automation devices and cells 110 kV LEP 161-164, 108, 158 PS 220/110 kV "Promyshlennaya"

Ensuring the reliability of power supply to consumers in the industrial area

АО «ПРЭК»

Ekibastuz

8.

Removal of quarterly heating networks from private territories of low-rise buildings in microdistricts No. 25, 26, 27, 28, 29, 31, 32, Ekibastuz

Removal of quarterly heating networks from private territories of low-rise buildings is caused by the lack of access for inspection, conducting current and major repairs, promptly shutting down consumers in emergency cases, and carrying out regulatory measures.

Pavlodar Heating Networks LLP

9.

Construction of block heat stations in Ekibastuz

In connection with the removal of heating systems from a private area, a new construction of 7 block heating stations is planned. The connection of quarter heat networks is provided by an independent scheme through plate heat exchangers. The filling and feeding of the independently connected system is carried out from the return pipeline of the heating network through the automated feeding unit. Automation of independent connection to a thermal network of systems is carried out by means of electronic temperature controllers (weather compensator).

Pavlodar Heating Networks LLP

10.

Reconstruction of the thermal highway TM-5 on the street. Abay

Improved heat supply to consumers

Pavlodar Heating Networks LLP

11.

Reconstruction of the thermal highway TM-7 on the street. Abay

Improved heat supply to consumers

Pavlodar Heating Networks LLP